The Challenge
UK Power Networks runs the electricity network that powers London, the South East and the East of England. As a network operator, it sees the energy transition from the inside, and it set out to cut the carbon and energy costs of its own estate too, including its operational site on Barton Road in Bury St Edmunds, Suffolk.
For an organisation that connects solar to the grid every day, its own installation had to meet the highest standards of safety, compliance and engineering quality, on a site that needed to stay fully operational.
The Solution
Eden Sustainable designed and delivered a 344 kWp rooftop solar PV system at the Bury St Edmunds site. UK Power Networks funded the project as a capital investment, so it owns the system outright and keeps every pound of saving it produces.
Working for a network operator meant every stage, from design and planning to installation and commissioning, was carried out to its strict safety and compliance requirements, with the site staying fully operational throughout.
The Outcome
The system now saves UK Power Networks around £55,000 a year on electricity and avoids 74 tonnes of CO₂ annually.
For an organisation helping millions of homes and businesses connect to cleaner power, it’s also a visible example of the same change on its own roof.